Projects of the Holding 


Information on major investment projects, implemented with the participation of subsidiaries of the Holding

Name of the Project Project cost, million tenge* Region Industry Startup date Workplaces
Инфраструктурные проекты
1 Construction of the initial magistral transport communication network 17 392 Transregional project Information and communication 2010 45
2 Construction of hardware-software complex and connectivity framework along raylway line 32 031 Transregional project Information and communication 2017 (plan) 0
3 Extention of LTE/GSM/UMTS networks on the territory of the Republic of Kazakhstan 107 585 Transregional project Information and communication 2018 (plan) 516
4 Construction of the reserve network of "Uzen-Aktau" gas transmission line at "Uzen-Zhetibay" site 3 668 Mangystau Transport and logistics 2008 112
5 Construction of transport and logistics hub of "А" class in Almaty region 5 549 Almaty Transport and logistics 2006 81
6 Extention of Aktau International Sea Commercial Port in the northern direction - stage 1,2 27 602 Mangystau Transport and logistics 2011 0
7 Modernization of the air strip of Aktau International Airport 24 106 Mangystau Transport and logistics 2012 564
8 Модернизация газораспределительной сети города Тараз 20 576 Zhambyl Transport and logistics 2019 (plan) 21
9 Modernization of gas distribution system in South Kazakhstan Region 36 821 SKR Transport and logistics 2017 (plan) 125
10 Acquisition of domestically produced passenger carriages 25 401 Astana Transport and logistics 2017 0
11 Gasification of five residential areas in Kyzylorda region 24 707 Kyzylorda Transport and logistics 2017 0
12 Construction of transport and logistics hub in Shymkent 15 796 SKR Transport and logistics 2017 (plan) 126
13 Construction of passenger terminal in Atana Airport 60 277 Astana Transport and logistics 2017 350
14 Gasification of residential areas and modernization of gas distribution network of Aktobe region 21 733 Aktobe Transport and logistics 2018 (plan) -
15 Construction of tourism hotel complex "Burabay Lakes Resort Hotel" 13 143 Akmolinsk Tourism 2012 260
16 Construction of tourism infrastructure unit – «MEGA Silk Way» shopping center on the territory of EXPO-2017 in Astana 64 676 Astana Tourism 2017 159
17 Construction of hotel complex with residential apartments in Astana under "St. Regis" brand 61 013 Astana Tourism 2017 (plan) 300
18 Construction of Monay power station on Charyn river 111 418 Almaty Energy 2012 127
19 Construction of gas turbine plant in Akshabulak deposit 41 549 Kyzylorda Energy 2012 95
20 Extention of Karaganda TPP-3 91 574 Karaganda Energy 2016 107
21 Constrcution of Turgunskaya power station in East Kazakhstan Region 11 594 EKR Energy 2018 (plan) 11
22 Construction of Hilton hotel complex in Astana, near EXPO-2017 35 461,0 Astana
2017 (plan) 100
23 Construction of wind electric power plant "Astana EXPO-2017" with the capacity of 100 MW (first start-up complex for 50 MW) 43 712 Akmolinsk Energy 2018 (plan) 24
Projects in processing industry
24 Construction of broiler farming poultry factory in Akmola region 33 576,0 Akmolinsk AIC 2019 (plan) 682
25 Construction of primary aluminum production plant with the capacity 250 thnd. tons in Pavlodar region 327 341,8 Pavlodar MMC 2010 2061
26 Construction track and rail plant in Aktobe 130 743,7 Aktobe MMC 2016 764
27 Extention and modernization of production of titan and magnesium products 43 544,4 EKR MMC 2010 40
28 Expansion of production of high-carbon ferrochrome in Aktobe ferroalloy plant 270 990,8 Aktobe MMC 2017 (plan) 500
29 Construction of plant for production of titanium slabs and ingots 20 238,7 EKR MMC 2014 82
30 Construction of sulphide ore concentrating mill 707 212,0 EKR MMC 2017 1500
31 Constrcution of cement plant in East Kazakhstan Region 41 789,8 EKR Production of construction materials 2012 658
32 Extention and modernization of service centers for exploitation and maintenance of agricultural machinery 7 965,2 Transregional project Engineering 2012 626
33 Creation of railroad wheel production complex 51 482,7 Pavlodar Engineering 2018 (plan) 400
34 Funding the expansion of vehicle production, incl. acquisition of CKD "Toyota Fortuner" vehicles 42 617,8 Kostanay Engineering 2014 470
35 Development of petroleum engineering plant 15 283,1 Atyrau Engineering 2018 (plan) 171
36 Modernization and reconstruction of Shymkent oil refinery 612 497,0 SKR Oil refining 2020 (plan) 302
37 Construction of aromatic hydrocarbon production plant in Atyrau oil refinery 363 343,7 Atyrau Oil refining 2015 -
38 Construction of advanced refining complex in Atyrau oil refinery 586 965,4 Atyrau Oil refining 2017 (plan) 277
39 Modernization of Pavlodar petrochemical plant 258 582,5 Pavlodar Oil refining 2017 (plan) 81
40 Motor fuel production of К5 ecological class 54 208,2 WKR Oil refining 2016 30
41 Construction of new capacities for water and drinks filling 2 700,0 SKR Food industry 2018 (plan) 290
42 Construction of sheet glass production and processing plant in Kyzylorda 42 072,3 Kyzylorda Production of construction materials 2018 (plan) 300
43 Investment project for the construction of sodium cyanide plant in Karatau 25 875,9 Zhambyl Chemical 2016 482
44 Construction and organization of chlorine and sodium hydrate production plant using membrane method in Pavlodar 32 614,4 Pavlodar Chemical 2011 539
45 Modernization of mineral fertilizer plant with the increase of estimated capacity of finished product output 56 087,5 Mangystau Chemical 2017 (plan) 16